PROJECT CONTROLS

Standards follow the project.

Code requirements are never one-size-fits-all. Each assignment starts with the owner’s specifications, contract documents, applicable jurisdiction and the approved inspection and test plan.

Public reference guidance only · No proprietary standards reproduced
HOW WE CONTROL REQUIREMENTS

Define. Verify. Record.

Before mobilization, the project team identifies governing documents, exact editions, inspection hold points, personnel qualifications, acceptance criteria and required deliverables.

01

Identify the governing documents

Owner specifications, purchase orders, drawings, ITPs, jurisdictional rules and referenced codes.

02

Match the scope and inspector

Check the required certifications, experience, training, employer approvals and independence obligations.

03

Control the revision

Track approved editions, addenda, superseded revisions, document ownership and distribution rights.

04

Close the inspection record

Capture the observation, governing requirement, evidence, disposition and approval trail.

Standards are not automatically interchangeable.

Examples include ASME piping and pressure-equipment codes, AWS structural welding codes, API pipeline and equipment standards, AMPP coating practices, and MSHA training requirements. Applicability must be established for each project. Licensed full-text standards and confidential owner documents will be available only to authorized users after permissions are verified.

Official reference organizations: ASME · AWS · API · AMPP · MSHA

DOCUMENT CONTROL

Need inspection coverage against a specific standard?

Send a non-confidential summary of the scope, code edition and site requirements for a qualifications review. Do not submit controlled drawings, proprietary inspection plans or licensed standards through the public inquiry form.